Product Details:
|
| Application: | Prefab Steel Structure Warehouse Buildings | Type: | Steel Structure Warehouse |
|---|---|---|---|
| Wall And Roof: | Aluminized Zinc Cladding Sheet | Raw Steel Material: | Q235B, Q355B |
| Working Scope: | Design,Fabrication, Installation | Surface Treatment: | Painting |
| Service Life: | 50 Years | ||
| Highlight: | Q355B Steel Structure Multi Span Warehouse,Prefabricated Multi Span Warehouse,Tire Factory Steel Structure Warehouse |
||
| Attribute | Value |
|---|---|
| Application | Prefab Steel Structure Warehouse Buildings |
| Type | Steel Structure Warehouse |
| Wall and Roof | Aluminized zinc cladding sheet |
| Raw steel material | Q235B, Q355B |
| Working scope | Design, Fabrication, Installation |
| Surface treatment | Painting |
| Service life | 50 Years |
With the development of prefabricated steel structure construction, advanced wall and roof insulation materials like aluminum-zinc color plates, aluminum magnesium manganese plates, and aluminum-plastic plates are increasingly used. These materials offer:
| Structure Type | Gable frame, single ridge, clean span or two spans |
| Length | 40-100m |
| Width | 20-80m |
| Eave Height | 6-15m |
| Roof Slope | 10% |
| Gable Wall Column Spacing | 7.5m |
| Roof Material | Aluminized zinc cladding sheet |
| Wall Material | Aluminized zinc cladding sheet |
| Steel Frame | H section steel | Q235/Q345 steel plate thickness: 8-30mm |
| Welding | Automatic submerged arc welding |
| Surface Treatment | Alkyd paint or galvanized |
| Roof System | Purlin: C160*60*2.5, Steel Q235, galvanized and painted |
| Wall System | Purlin: C160*60*2.5, Steel Q235, painted |
| 1 | Light weight, high strength and large span Steel offers excellent strength-to-weight ratio, enabling large span structures with relatively small weight. |
| 2 | Short construction period Factory prefabrication of components allows for quick on-site assembly. |
| 3 | High fire resistance Fire-retardant coatings enhance fire endurance when properly applied. |
| 4 | Weather protection Advanced sealing techniques prevent water infiltration at joints and connections. |
Our 35,000㎡ fabrication facility includes:
Contact Person: steven
Tel: 0086-18661691560