Product Details:
|
Features: | Structural Steel Frame Construction | Application: | Metal Frame Construction, Industrial Steel Structures |
---|---|---|---|
Raw Steel Material: | Q235B, Q355B | Type: | Steel Structure Construction |
Working Scope: | Design,Fabrication, Installation | Surface Treatment: | Painting |
Service Life: | 50 Years | Wall And Roof: | Steel Cladding Sheet |
Highlight: | steel frame building,prefab metal buildings |
Metal Frame Construction / Industrial Steel Structures / Structural Steel Frame Construction
Metal Frame Construction / Industrial Steel Structures / Structural Steel Frame Construction. We could contract the projects such as prefabricated steel structure warehouse, workshop, storage sheds, garage, hangar, chicken shed, car parking, showroom, office buildings, gym, dormitory building, high rise steel residence buildings, oli&gas project, power station, infrastructure buildings, etc. The major factors that effect the budget of prefabricated steel structure buildings are as below:
1. The height of the building, according to actual needs, increases the construction cost by 2% to 3% for every 10cm increase.
2. With or without crane tonnage, the choice of crane tonnage is also a big deal. If the tonnage selected is too large, it will cause waste of equipment, which is too small to meet the construction needs. Of course the price is different.
3. The protection structure, this is also the cost to consider, such as doors, windows, exterior walls and so on.
4. The type of the design structure of the factory building in the location, the building time, the use and other related factors.
5. The size of the construction area is the most essential influence. The large area must have a large amount of steel, and the cost of the steel structure factory building is relatively high. The width determines the area, and of course, it is also closely related to the structure of the plant design.
6. The length of the steel structure span, generally speaking, the larger the span, the lower the cost. Of course, the span is arranged according to its own needs, the design is different, the span is also different, of course, the requirements of the column distance are also very different.
7, the amount of steel required, the steel structure factory building cost has the greatest impact on the amount of steel. In addition to the source of the steel, the imported ones are also different from the domestic ones, and the color steel plates or sandwich plates are also different. On the same material, the area that has the greatest influence on the amount of steel is its area. The size of the building area determines the amount of steel used. Of course, the design of the structure is also within the scope of influence.
Item name | Specification | Material Parameter | Technical Treatment |
Column | H-section steel | Q235B,Q345B | Paint or Hot dip galvanized |
Beam | H-section steel | Q235B,Q345B | Paint or Hot dip galvanized |
Bracing | Steel rod,Steel pipe,Angle steel | Q235B,Q345B | |
Purling | C or Z shape, purling Thickness:1.8mm~3.0mm | Q235B,Q346B | Hot dip galvanized |
Wall and roof panel | EPS,Rock wool,Pu,Glass wool Sandwich panel or Single sheet. | Steel T=0.426~0.8mm,insulation T=50~150mm | Alu-zinc 150g, Fluorocarbon paint |
Door | Sliding or rolling door | Steel or Aluminum sheet,T=1.0~1.5mm | Paint or Hot dip galvanized |
Window | alloy-Glass,Aluminium alloy-shutter | T=1.0~2.0mm | Alloy |
Lighting panel | FRP, T=1.5mm or T=1.8mm | Coefficient of thermal expansion:2.2x10-5/cm/cm/℃ | Light transmittance 85% |
Ventilator | Turbine ventilator, and electric type | Steel,stainless steel,PC | Paint or Hot dip galvanized,304 |
Gutter | Galvanized or stainless steel plate | T=2.0mm | Hot dip galvanized,304 |
Downpipe | PVC pipe,Color steel pipe T=0.5mm | Φ110,160,200 | Paint |
Bolt | Ordinary, high strength | 10.9S,4.8s | Hot dip galvanized |
Anchor bolt | Steel rod M24,M27 M30 | Q235B |
We have a dedicated steel structure engineering design department and research and development department, and established an independent and complete steel structure engineering design, optimization and deepening design system. Establishing engineering materials than building materials, we not only control the reliability and economy of the structure, but also the categories, performance, selection and combination of traditional enclosing materials and new maintenance materials. Our design is not only more applicable, safer, more economical, but also rich in architectural beauty.
We will provide installation drawing for each project to guide installation. If you need, we could dispatch our engineer to construction site to guide installation or we install it directly.
The following question we need to know before making the price. Just feel free to fill what you know.
1 |
Location (where will be built?) |
_____country, area |
2 |
Size: length*width*height |
_____mm*_____mm*_____mm |
3 |
wind load (max. wind speed) |
_____kn/m2, _____km/h, _____m/s |
4 |
snow load (max. snow height) |
_____kn/m2, _____mm |
5 |
anti-earthquake |
_____level |
6 |
brickwall needed or not |
If yes, 1.2m high or 1.5m high |
7 |
thermal insulation |
If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; . if not, the metal steel sheets will be ok. The cost of the latter will be much |
8 |
door quantity & size |
_____units, _____(width)mm*_____(height)mm |
9 |
window quanity & size |
_____units, _____(width)mm*_____(height)mm |
10 |
crane needed or not |
If yes, _____units, max. lifting weight____tons; max. lifting height _____m |
Contact Person: steven
Tel: 0086-18661691560