Send Message
Home ProductsSteel Structure Warehouse

Painting Surface Metal Warehouse Buildings / Steel Structure Factory Building Steel Cladding Sheet

Certification
China Qingdao Ruly Steel Engineering Co.,Ltd certification
China Qingdao Ruly Steel Engineering Co.,Ltd certification
Customer Reviews
To be honest, i am not so familiar with steel structure at beginning, but they give me a perfect proposal to help me complete my project, good job, Ruly steel

—— Mike Guioguio

The delivery time is quick, and very important: the products always sent match the order. I trust them because i have never been disappointed with them.

—— Mae Cena

This mutual cooperation last for about 4 years,and must admit the service they provide is above expected.

—— Terry Shepley

I'm Online Chat Now

Painting Surface Metal Warehouse Buildings / Steel Structure Factory Building Steel Cladding Sheet

Painting Surface Metal Warehouse Buildings / Steel Structure Factory Building Steel Cladding Sheet
Painting Surface Metal Warehouse Buildings / Steel Structure Factory Building Steel Cladding Sheet Painting Surface Metal Warehouse Buildings / Steel Structure Factory Building Steel Cladding Sheet

Large Image :  Painting Surface Metal Warehouse Buildings / Steel Structure Factory Building Steel Cladding Sheet

Product Details:
Place of Origin: China
Brand Name: Ruly Steel
Certification: SGS, BV, ISO
Model Number: Ruly0215
Payment & Shipping Terms:
Minimum Order Quantity: 500 Square Meter
Packaging Details: As request
Delivery Time: 30 Days
Payment Terms: L/C, T/T, Western Union
Supply Ability: 20000 Square Meter Per Month

Painting Surface Metal Warehouse Buildings / Steel Structure Factory Building Steel Cladding Sheet

Description
Features: Structural Steel Fabricators Application: Builders Warehouse, Metal Buildings
Type: Steel Structure Warehouse Raw Steel Material: Q235B, Q355B, ASTM A36
Service Life: 50 Years Wall And Roof: Steel Cladding Sheet
Surface Treatment: Painting Working Scope: Design,Fabrication, Installation
High Light:

steel structure building

,

metal warehouse construction

,

Q235B Metal Warehouse Buildings

 

Steel Frame Builders Warehouse / Structural Steel Fabricators For Metal Buildings

 

Steel Frame Builders Warehouse / Structural Steel Fabricators For Metal Buildings. This is a prefab steel structure buildings for storage chemial production in a industrial area. Portal frame structure, Welded H-section steel beams and columns are connected by high strength bolts to be the main steel frame strucutre, EPS sandwich panel as wall and roof insulation panel. We could contract the projects such as prefabricated steel structure warehouse, workshop, storage sheds, garage, hangar, chicken shed, car parking, showroom, office buildings, gym, dormitory building, high rise steel residence buildings, oli&gas project, power station, infrastructure buildings, etc.

 

Specification of steel structure logistics warehouse:

 

Steel Frame H section steel Q235/Q345 steel plate thickness: 8-30mm
Welding Automatic submerged arc welding
Rust removal Sand blasting
Surface finish Alkyd paint or galvanized
Intensive bolt M20,Grade 10.9
Supporting System Angle brace L50x4,Steel Q235, processed and painted
Horizontal brace Φ20, Steel Q235, processed and painted
Column brance Φ20, Steel Q235, processed and painted
Tie rod Φ89*3, Steel Q235, processed and painted
Ordinary bolt M12 Galvanized bolt
Roof Purlin C160*60*2.5,Steel Q235, galvanized and painted
Roof panel Sandwich panel or corrugated steel sheet
Sky light 6mm thick PVC
Accessories Glass cement, self-tapping screws, etc.
Edge cover 0.4mm steel sheet profile trimming
Gutter 0.4mm thick sheet steel profile or galvanized sheet
Down pie Φ110PVC
Walls Purlin C160*60*2.5,Steel Q235, painted
Wall Sandwich panel or corrugated steel plate
Accessories Glass cement, self-tapping screws, etc.
Edge cover 0.4mm steel sheet profile trimming
Ventilation Ventilation ball
Doors & windows Rolling door/sliding door PVC/alu/steel/window

 

Steel structure fabrication in our factory:

The floor space of our steel structre fabrication factory is 35,000㎡, and the workshop area is 20000㎡. We own three light/heavy H steel production lines, BOX production lines, C/Z purlin production lines and various types of profiling steel sheet machines with advanced equipment such as plasma cutting machine.

Painting Surface Metal Warehouse Buildings / Steel Structure Factory Building Steel Cladding Sheet 0

 

How to install:

We will design the construction drawing for each project to guide installation. For abroad project, we could dispatch our engineer to guide installation on site or our construction team construct on site.

Painting Surface Metal Warehouse Buildings / Steel Structure Factory Building Steel Cladding Sheet 1

Advantages of prefabricated steel structure buildings:

 

1 Light weight, high strength and large span: Although the density of steel is larger than other building materials, its strength is very high. Under the same force condition, the steel structure has small weight and can be made into a structure with a large span.
2 Short construction period The main components of the plant are prefabricated in the factory. After being transported to the site, the installation is carried out, and the assembly work is convenient.
3 High fire resistance When the surface temperature of steel is within 150 °C, its strength changes little. When the temperature exceeds 150 °C, its strength drops significantly. Fire-retardant coatings are generally applied to the surface of the steel structure to form a protective film that enhances the fire endurance of the component. Of course, the reasonable division of the fire compartment is also very important for the use of fire shutters.
4 Anti-seepage and waterproof the infiltration of rainwater is mainly through nodes or gaps. To prevent seepage and waterproof, it is necessary to use concealed fixing after the sealing gasket is used at the screw mouth, and sealant or welding treatment is used at the joint of the plate. It is good to use a long plate to eliminate the lap joint, and the swell is tightly waterproofed at various joints.
5 Sound insulation Fill the metal roofing layer with soundproofing material (usually glass wool), or apply heat-reflective coating on the metal tile surface.
6 Ventilation and cooling Generally high-architecture workshops, no extra-high-power heating equipment, personnel are not very dense, and there is no odor or dust. The roof fan + gas building can be used. For steel structures with higher structure and larger span, the best is to install a large exhaust fan on the roof to exhaust the air; to form indoor negative pressure; press a lot of fresh air into the workshop from the surrounding of the workshop to form air. Convection; the effect is better.
7 Good lighting Install lighting panels or lighting glass at specific locations on the roof. Considering the service life of the sunroof and the coordination of the roof panels, the joints must be waterproof.