Product Details:
|
Application: | Steel Structure Aircraft Hangar Buildings | Usage: | Temporary Aircraft Hangar, Steel Airplane Hangars, Airplane Hangar Construction |
---|---|---|---|
Type: | Steel Structure Hangar | Raw Steel Material: | Q235B, Q355B, ASTM A36 |
Surface Treatment: | Painting Or Hot-dip Galvanize | Wall And Roof: | Steel Cladding/Rock Wool/Glass Wool/EPS/PU Sandwich Panel |
Columns And Beam: | H Section Column&Beam | Installation: | Engineer Guidance On Site |
Highlight: | steel portal frame building,aircraft hangar construction |
Steel Structure Aircraft Hangar Buildings Temporary Aircraft Hangar Construction
Steel Structure Aircraft Hangar Buildings Temporary Aircraft Hangar Construction. We design and prvide all sizes of airplane hangars accoridng to your request or accommodate your craft. Our steel frames support large spans and height for clearance. Bi-folding doors,swing out,or sliding doors can be engineered into the aviation building frame. These buildings and doors are designed for specific snow, wind, and seismic conditions for your area.
We can design and fabricate customized steel structure components for light and heavy steel structure buildings in protal frame and dome frame, such as warehouse, workshop, storage, hangar, chicken shed, steel shed for market and ground parking, supermarket , high rise steel office buiding, factory , plant, exhibition hall, gym, dormitory building, oli&gas, power station, infrastructure buildings, etc.
Name | Steel Structure Aircraft Hangar Buildings Temporary Aircraft Hangar Construction | |
Dimension | Length | H beam:400-1500mm |
Thickness |
web plate: 6-32mm |
|
Height | 200-1200mm | |
color | according to customers | |
size | MOQ is300m2,wideth*length*eave height |
Advantage |
1. low cost but beautiful out look |
Main |
base | cement and steel foundation bolts |
Main frame | H beam | |
Material | Q235B, Q345B or others as customer's request | |
Purlin | C or Z purlin,size from C120-C320,Z100-Z20 | |
bracing | X-type or other type bracing made from angle,round pipe. | |
bolt | plain bolt and high strength bolt | |
door | sliding or rolling door | |
Window | Aluminium alloy window | |
surface | two ways of anti-rust painting or hot dip galvanized |
components | sheet | 0.5mm or 0.6mm galvanized sheet |
Accessories | semi-transparent skyling belts, Ventilators,down pipe,galvanized gutter,etc. |
Main Steel Frame System | |
Main structure | H section steel Q345, alkyd painting, two primary painting, two finish painting. |
Roof purlin | XZ160*60*20*2.5, galvanized |
Wall purlin | XZ160*60*20*2.5, galvanized |
Intensive bolt | Grade 10.9 |
Turn buckle bolt | M20+2, steel Q235, processing |
Anchor bolt | M24, steel Q235, processing |
Ordinary bolt | Galvanized bolt M20 |
Ordinary bolt | Galvanized bolt M12 |
Edge cover | 0.5mm color plate, angle Alu. |
Fittings & accessories | Nails, glue etc. |
Roof drainage system | |
Gutter | 0.5mm color steel plate |
Rainspout pipes | Φ110 PVC pipe |
1: We provide shop drawing before installation.
2. Then our engineer guide on site for installation
1 | Steel structural material has high strength and light weight | The steel structure has high strength. Compared with the concrete structure, the steel structure beam and the column cross-sectional area are small, which can increase the effective use area. Generally, the cross-sectional area of the high-rise steel structure column accounts for about 3% of the building area, and the cross-sectional area of the high-rise concrete structure accounts for 7%-9% of the building area. |
2 | Steel structure construction speed is fast | Most of the steel structure is produced in the factory and transported to the site for integral assembly by welding or bolting. It can be used all day, because the steel structure itself can be used as a load-bearing structure for the construction load to reduce the formwork during construction, thus not only reducing costs, but also greatly speeding up Construction speed. The construction speed of the steel structure is about 1.5 times that of the concrete structure. |
3 | Convenient pipeline layout | In the structural space of the steel structure, the truss type member or the member having the cavity can be used, so that the arrangement of the pipeline is convenient, and the replacement and repair of the pipeline is convenient. However, if a concrete structure is used, the beam should not be opened, and the pipe generally passes under the beam, thereby occupying a certain space. In the case of the same floor height, the floor height of the steel structure can be smaller than the floor height of the concrete structure, which can reduce the area of the outer wall. |
4 | The steel construction environment is less polluted | When steel structure is constructed, sand, stone, soil, cement and other materials are rarely used, and pollution problems such as dust flying, waste accumulation and noise are avoided from the root wood. |
5 | Steel structure construction conforms to sustainable development policy | The steel structure industry is a green-bag environmental protection construction industry. Its utilization of resources and energy is relatively reasonable, and has little damage to the environment. |
Contact Person: steven
Tel: 0086-18661691560