Send Message
Home ProductsSteel Structure Warehouse

Prefabricated Steel Structure Warehouse Building Construction Prefab Metal Workshop

Certification
China Qingdao Ruly Steel Engineering Co.,Ltd certification
China Qingdao Ruly Steel Engineering Co.,Ltd certification
Customer Reviews
To be honest, i am not so familiar with steel structure at beginning, but they give me a perfect proposal to help me complete my project, good job, Ruly steel

—— Mike Guioguio

The delivery time is quick, and very important: the products always sent match the order. I trust them because i have never been disappointed with them.

—— Mae Cena

This mutual cooperation last for about 4 years,and must admit the service they provide is above expected.

—— Terry Shepley

I'm Online Chat Now

Prefabricated Steel Structure Warehouse Building Construction Prefab Metal Workshop

Prefabricated Steel Structure Warehouse Building Construction Prefab Metal Workshop
Prefabricated Steel Structure Warehouse Building Construction Prefab Metal Workshop Prefabricated Steel Structure Warehouse Building Construction Prefab Metal Workshop Prefabricated Steel Structure Warehouse Building Construction Prefab Metal Workshop Prefabricated Steel Structure Warehouse Building Construction Prefab Metal Workshop Prefabricated Steel Structure Warehouse Building Construction Prefab Metal Workshop Prefabricated Steel Structure Warehouse Building Construction Prefab Metal Workshop

Large Image :  Prefabricated Steel Structure Warehouse Building Construction Prefab Metal Workshop

Product Details:
Place of Origin: China
Brand Name: Ruly Steel
Certification: SGS, BV, ISO
Model Number: Ruly0493
Payment & Shipping Terms:
Minimum Order Quantity: 500 Square Meter
Packaging Details: As request
Delivery Time: 30 Days
Payment Terms: L/C, T/T, Western Union
Supply Ability: 20000 Square Meter Per Month

Prefabricated Steel Structure Warehouse Building Construction Prefab Metal Workshop

Description
Features: Light Steel Structure Warehouse Application: Manufacturer Of Structural Steel Buildings Warehouse
Type: Prefab Steel Structure Warehouse Raw Steel Material: Q235B, Q355B, ASTM A36
Service Life: 50 Years Wall And Roof: Steel Cladding Sheet
Surface Treatment: Painting Working Scope: Design,Fabrication, Installation
High Light:

Prefabricated Steel Warehouse

,

ASTM A36 Prefab Metal Workshop

,

Light Prefab Steel Structure Warehouse

Famous Prefabricated Steel Frame Structure Building Construction Warehouse Prefab Metal Workshop

 

Professional Manufacturer Of Structural Steel Buildings Warehouse.  Qingdao Ruly Steel Engineering Co.,Ltd is a professional steel structure fabrication and construction company for light and heavy steel structure project. Our service include design, fabrication for all the steel structure components and insullation panel, installation on site. The floor space of our steel structre fabrication factory is 35,000㎡, and the workshop area is 20000㎡. We own three light/heavy H steel production lines, BOX production lines, C/Z purlin production lines and various types of profiling steel sheet machines with advanced equipment such as plasma cutting machine.

 

We could contract the projects such as prefabricated steel structure warehouse, workshop, storage sheds, garage, hangar, chicken shed, car parking, showroom, office buildings, gym, dormitory building, high rise steel residence buildings, oli&gas project, power station, infrastructure buildings, etc.

 

Specification of steel structure logistics warehouse:

 

Item name Specification Material Parameter Technical Treatment
Column H shaped steel  Q235B,Q345B Paint or Hot dip galvanized
Beam H shaped steel  Q235B,Q345B Paint or Hot dip galvanized
Bracing Steel rod,Steel pipe,Angle steel Q235B,Q345B  
Purling C or Z shape, purling Thickness:1.8mm~3.0mm Q235B,Q346B Hot dip galvanized
Wall and roof panel EPS,Rock wool,Pu,Glass wool Sandwich panel or Single sheet. Steel T=0.426~0.8mm,insulation T=50~150mm Alu-zinc 150g, Fluorocarbon paint
Door Sliding or rolling door Steel or Aluminum sheet,T=1.0~1.5mm Paint or Hot dip galvanized
Window alloy-Glass,Aluminium alloy-shutter T=1.0~2.0mm Alloy
Lighting panel FRP, T=1.5mm or T=1.8mm Coefficient of thermal expansion:2.2x10-5/cm/cm/℃ Light transmittance 85%
Ventilator Turbine ventilator, and electric type Steel,stainless steel,PC Paint or Hot dip galvanized,304
Gutter Galvanized or stainless steel plate T=2.0mm Hot dip galvanized,304
Downpipe PVC pipe,Color steel pipe T=0.5mm Φ110,160,200 Paint
Bolt Ordinary, high strength 10.9S,4.8s Hot dip galvanized
Anchor bolt Steel rod M24,M27 M30 Q235B  

 

Advantages of prefabricated steel structure buildings:

 

1 Light weight, high strength and large span: Although the density of steel is larger than other building materials, its strength is very high. Under the same force condition, the steel structure has small weight and can be made into a structure with a large span.
2 Short construction period The main components of the plant are prefabricated in the factory. After being transported to the site, the installation is carried out, and the assembly work is convenient.
3 High fire resistance When the surface temperature of steel is within 150 °C, its strength changes little. When the temperature exceeds 150 °C, its strength drops significantly. Fire-retardant coatings are generally applied to the surface of the steel structure to form a protective film that enhances the fire endurance of the component. Of course, the reasonable division of the fire compartment is also very important for the use of fire shutters.
4 Anti-seepage and waterproof the infiltration of rainwater is mainly through nodes or gaps. To prevent seepage and waterproof, it is necessary to use concealed fixing after the sealing gasket is used at the screw mouth, and sealant or welding treatment is used at the joint of the plate. It is good to use a long plate to eliminate the lap joint, and the swell is tightly waterproofed at various joints.
5 Sound insulation Fill the metal roofing layer with soundproofing material (usually glass wool), or apply heat-reflective coating on the metal tile surface.
6 Ventilation and cooling Generally high-architecture workshops, no extra-high-power heating equipment, personnel are not very dense, and there is no odor or dust. The roof fan + gas building can be used. For steel structures with higher structure and larger span, the best is to install a large exhaust fan on the roof to exhaust the air; to form indoor negative pressure; press a lot of fresh air into the workshop from the surrounding of the workshop to form air. Convection; the effect is better.
7 Good lighting Install lighting panels or lighting glass at specific locations on the roof. Considering the service life of the sunroof and the coordination of the roof panels, the joints must be waterproof.

 

Our steel structure production line:

The steel structure is mainly produced in a specialized metal structure factory, so the production is simple and the precision is high. All components are prefabricated at the factory, and the site is simply assembled, which greatly shortens the construction period.

Prefabricated Steel Structure Warehouse Building Construction Prefab Metal Workshop 0

 

How to install:

 

We will design the construction drawing for each project to guide installation. For abroad project, we could dispatch our engineer to guide installation on site or our construction team construct on site.

Prefabricated Steel Structure Warehouse Building Construction Prefab Metal Workshop 1

How to quote:

The following question we need to know before making the price. Just feel free to fill what you know.

1 Location (where will be built?) _____country, area
2 Size: length*width*height _____mm*_____mm*_____mm
3 wind load (max. wind speed) _____kn/m2, _____km/h, _____m/s
4 snow load (max. snow height) _____kn/m2, _____mm
5 anti-earthquake _____level
6 brickwall needed or not If yes, 1.2m high or 1.5m high
7 thermal insulation If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; . if not, the metal steel sheets will be ok. The cost of the latter will be much
lower than that of the former
8 door quantity & size _____units, _____(width)mm*_____(height)mm
9 window quanity & size _____units, _____(width)mm*_____(height)mm
10 crane needed or not If yes, _____units, max. lifting weight____tons; max. lifting height _____m

Contact Details
Qingdao Ruly Steel Engineering Co.,Ltd

Contact Person: steven

Tel: 0086-18661691560

Send your inquiry directly to us (0 / 3000)