|
Product Details:
|
Features: | Galvanized Metal Buildings | Application: | Light Steel Structure Warehouse |
---|---|---|---|
Type: | Steel Structure Warehouse | Working Scope: | Design,Fabrication, Installation |
Raw Steel Material: | Q235B, Q355B, ASTM A36 | Service Life: | 50 Years |
Wall And Roof: | Steel Cladding Sheet | Surface Treatment: | Painting |
Highlight: | Low Carbon Steel Structure Warehouse,Q235 Steel Structure Warehouse,Seismic Steel Structure Warehouse |
Q235 Q345 Low Carbon Steel Structure Warehouse Seismic Performance
Steel Structure Warehouse Buildings components as follows
Main Structure : Steel Column , Roof Steel Beam , the Materials Q345B Welding H Beam , Yield Strength :345Mpa
Secondary Structure : Roof Bracing , Column Bracing , Roof Purlin , Wall Purlin , Tie Bar ects , Materials : Q235B Steel , Yield Strength : 235Mpa
Wall and Roof : Single Colour Sheet.
Steel Structure Warehouse Building is formed by the main framework through linking up the H beam,C purline,Z purline,U purline steel components. Roof and wall using a variety of panels together with other components
such as windows and doors. The steel structure Workshop has the advantages of wide span, high strength, light weight, low cost, temperature protection, save energy,beautiful appearance, short construction time,
good effect of insulation, long using life, space-efficient, good seismic performance, flexible layout,etc.
Steel Structure Warehouse Buildng cost a little less than normal buildings. The construction process with pre-engineered steel buildings is usually not affected by delays like normal construction. Since the building just needs to be assembled, there are rarely any surprise cost increases. Also, these buildings can be assembled and erected by almost anyone, so labor costs are reduced and you save you time in the process.
Steel Structure Warehouse building is the quick assembly. Construction of a normal building takes at least a few months to complete. Steel Structure Warehouse are very quick and easy to erect. All of the drilling, cutting, and welding is done at the manufacturing site. The components are then sent to the construction site to be assembled. Besides the quick construction times, these buildings are usually cheaper than normal construction.
Item name | Specification | Material Parameter | Technical Treatment |
Column | H shape,Box,steel pipe,Hot rolled sheet | Q235B,Q345B | Paint or Hot dip galvanized |
Beam | H shape,steel Truss,Hot rolled sheet | Q235B,Q345B | Paint or Hot dip galvanized |
Bracing | Steel rod,Steel pipe,Angle steel | Q235B,Q345B | |
Purling | C or Z shape, purling Thickness:1.8mm~3.0mm | Q235B,Q346B | Hot dip galvanized |
Wall and roof panel | EPS,Rock wool,Pu,Glass wool Sandwich panel or Single sheet. | Steel T=0.426~0.8mm,insulation T=50~150mm | Alu-zinc 150g, Fluorocarbon paint |
Door | Sliding or rolling door | Steel or Aluminum sheet,T=1.0~1.5mm | Paint or Hot dip galvanized |
Window | alloy-Glass,Aluminium alloy-shutter | T=1.0~2.0mm | Alloy |
Lighting panel | FRP, T=1.5mm or T=1.8mm | Coefficient of thermal expansion:2.2x10-5/cm/cm/℃ | Light transmittance 85% |
Ventilator | Turbine ventilator, and electric type | Steel,stainless steel,PC | Paint or Hot dip galvanized,304 |
Gutter | Galvanized or stainless steel plate | T=2.0mm | Hot dip galvanized,304 |
Downpipe | PVC pipe,Color steel pipe T=0.5mm | Φ110,160,200 | Paint |
Bolt | Ordinary, high strength | 10.9S,4.8s | Hot dip galvanized |
Anchor bolt | Steel rod M24,M27 M30 | Q235B |
The advantage of Steel Structural Warehouse building as follows
1) Light Deadweight , large span ,great strength ,
2)Finished Quickly , fast construction ,
3) Anti-fire , anti-rust ,
4) Green building , enveronmental protection .
5) Easily Installation , save manpower
Contact Person: steven
Tel: 0086-18661691560