Product Details:
|
Raw Steel Material: | Q235B, Q355B | Surface Treatment: | Painting |
---|---|---|---|
Shot Blasting Level: | Sa 2.5 | Service Life: | 50 Years |
Wall And Roof: | Glass Wool Sandwich Panel | Type: | Steel Frame Structure Workshop |
Working Scope: | Design,Fabrication, Installation | Application: | Vehicle Maintenance, Auto Repair Shop |
Highlight: | steel frame building,steel frame construction |
Large Metal Garage Shop Buildings Steel Frame House Construction For Vehicle Maintenance
This is a Large Metal Garage Shop Buildings Steel Frame House Construction For Vehicle Maintenance. The steel frame structure of this light metal shop buildings is welded H-section steel columns and beams that is connected by high strength bolts. Glass wool sandwich panel is used as roof and wall insulation panels. We could design it in clean span or double spans. It also has office and storage buildings inside.
Due to the overall rigidity and seismic performance of the steel structure, fast construction speed, light weight and high bearing capacity, it replaces the reinforced concrete structure in modern industrial and civil buildings.
For such project, we could design the drawing, fabricate all the steel structure components, delivery and install it as your request.
Name |
Large Metal Garage Shop Buildings Steel Frame House Construction For Vehicle Maintenance |
Structure Type |
Gable frame, single ridge, clean span or two spans |
Length |
40-150m |
Width |
20-80m |
Eave Height |
6-20m |
Roof Slope |
10% |
Gable Wall Column Spacing |
7.5m |
Roof |
Glass wool sandwich panel |
Wall |
Glass wool sandwich panel |
Door |
Sliding door |
Window |
Ribbon Skylight |
Height difference between indoor and outdoor |
300mm |
No. | Item | Details of steel structure building or steel frame | |
1 | Material | Material | carbon structural steel |
2 | Produce | Lead time | Normallly 45days after down payment, also according to quantity. |
3 | Quality | Certification | Quality certificate from factory, the third party by client request. |
4 | Dimensions | Length | H beam: 4000-15000mm |
5 | Thickness: | web plate: 6-32mm | |
6 | wing plate: 6-40mm | ||
7 | Height | 200-1200mm | |
8 | Color | According to customers | |
9 | Size | MOQ is 1000 m2, width * length * eave height, | |
10 | Main components | Base | Cement and steel foundation bolts |
11 | Main frame | H Steel beam, Q235 Q345 steel H beam and columns, painted or galvanized, box steel, galvanized C section or steel pipe | |
12 | Secondary frame : | galvanized C or Z purlin , steel bracing , tie bar , knee brace ,flashing etc. | |
13 | Material | Q235B, Q345B or others as buyers' requests, like: ASTM, BSEN, DIN, IPE,AISI,JIS, | |
14 | Purlin | C or Z purlin: Size from C120~C320, Z100~Z20 | |
15 | Column | X-type, tree type ,lattice, Cross, Box etc. | |
16 | Bolt | Plain bolt and High-strength bolt | |
17 | Roof & wall | PU sandwich panel, Rockwool sandwich panel or Corrugated steel sheet | |
18 | Canopy | steel sheet, PU sandwich panel, Rockwool sandwich panel | |
19 | Door | Sliding or rolling door | |
20 | Window | Aluminium alloy window | |
21 | Surface | Two lays of rust-proof painting or Hot Dip Galvanized | |
22 | Sheet | 0.5mm or 0.6mm galvanized sheet | |
23 | Accessories | Semi-transparent skylight belts, Ventilators,down pipe, Galvanized gutter, Trim, flashing, etc | |
24 | Finishing options | Vast array of colors and textures available, Alkyd painting, two primary painting, two finish painting (gray paint, red paint, white paint, epoxy zinc etc.). Or Galvanized. | |
25 | Usages | 1. Steel workshop, steel warehouse, steel structure plant | |
26 | 2. Steel web frame structure | ||
27 | 3. Steel H-column and steel H-beam | ||
28 | 4. Portal frame products | ||
29 | 5. High rise building project | ||
30 | 6. Others steel structure buildings |
We have three production lines for steel structure fabrication, in order to serve better for abroad project, we buy some advanced machine in our production line, such as the plasma cutting machine. We will show you our production line following the steel structure processing flow as below:
1. Structural steel fabrication, painting , galvanizing , pre-assembly
2. Designing, fabrication and installation for Prefabricated steel structure building.
3. Deepen or design the fabrication drawing or shop drawing based on your architectural drawing and construction drawing
4. Engineering consulting service
1. Container 20 feet: Inside: 5.69m x 2.34m x 2.18m, Gross weight: 17.5 ton, volume is 24-26m3.
2. Container of 40 feet: Inside: 11.8m x 2.34m x 2.18m, Gross weight: 22 ton, volume is 54m3.
3. HC container: Inside: 13.58m x 2.34m x 2.71m, Gross weight: 29 ton, volume is 68m3.
4. All of the steel columns &beams ends and plates will be packed by the blanket to protect them from the crash in the container during the shipment.
Contact Person: steven
Tel: 0086-18661691560