Send Message
Home ProductsSteel Structure Construction

Height 12.5m Logistics Steel Structure Construction

Certification
China Qingdao Ruly Steel Engineering Co.,Ltd certification
China Qingdao Ruly Steel Engineering Co.,Ltd certification
Customer Reviews
To be honest, i am not so familiar with steel structure at beginning, but they give me a perfect proposal to help me complete my project, good job, Ruly steel

—— Mike Guioguio

The delivery time is quick, and very important: the products always sent match the order. I trust them because i have never been disappointed with them.

—— Mae Cena

This mutual cooperation last for about 4 years,and must admit the service they provide is above expected.

—— Terry Shepley

I'm Online Chat Now

Height 12.5m Logistics Steel Structure Construction

Height 12.5m Logistics Steel Structure Construction
Height 12.5m Logistics Steel Structure Construction Height 12.5m Logistics Steel Structure Construction Height 12.5m Logistics Steel Structure Construction Height 12.5m Logistics Steel Structure Construction Height 12.5m Logistics Steel Structure Construction

Large Image :  Height 12.5m Logistics Steel Structure Construction

Product Details:
Place of Origin: China
Brand Name: Ruly Steel
Certification: SGS, ,ISO, BV
Model Number: Ruly0239
Payment & Shipping Terms:
Minimum Order Quantity: 300 Square Meter
Packaging Details: As request
Delivery Time: 30 Days
Payment Terms: L/C, T/T, Western Union
Supply Ability: 20000 Square Meter Per Month

Height 12.5m Logistics Steel Structure Construction

Description
Application: Light Steel Structure Warehouse Usage: Steel Structure Workshop, Metal Warehouse, Factory Buildings, Garment Factory,
Type: Pre Engineered Steel Structure Our Service: Design, Fabrication, Construction
Service Life: 50 Years Surface Treatment: Painting Or Hot-dip Galvanize
Wall And Roof: Steel Cladding Columns And Beam: H Section Column&Beam
High Light:

Logistics Steel Structure Construction

,

12.5m Steel Structure Construction

,

Q345 Prefabricated Steel Buildings

Light Steel Structure Warehouse Buildings For Logistics / Pre Engineered Steel Structure

 

Project information:

 

This is the Light Steel Structure Warehouse Buildings For a Logistics Park. This logstics park is planned in two phases, with a total area of 400,000 square meters, the first phase covers an area of 200,000 square meters, and the construction scale is 120,000 square meters. The construction content includes two office buildings, several special warehouses for sports goods & standard comprehensive warehouse. It has designed the high-level platform and indoor clear height up to 12.5 meters, which can adapt to a variety of pallet racks and warehouse structures required by VNA warehouses. Its column network structure with a span of 24 meters will bring huge space utilization to customers Customers can divide the warehouse space arbitrarily according to their needs, combine them into various areas and patterns of material flow lines, and are equipped with standard office space. The park also fully considers the loading and unloading space requirements of large container trucks. Its building span is 64 meters wide and is designed with sufficient parking facilities. It is also designed for third-party logistics companies or other companies serving retail, wholesale, distribution and manufacturing industries. Commercial customers provide a package solution.

 

Material list for the logstics steel structures warehouse and technical parameters:

 

Main Steel Frame System
Main structure H section steel Q345, alkyd painting, two primary painting, two finish painting.
Roof purlin XZ160*60*20*2.5, galvanized
Wall purlin XZ160*60*20*2.5, galvanized
Intensive bolt Grade 10.9
Turn buckle bolt M20+2, steel Q235, processing
Anchor bolt M24, steel Q235, processing
Ordinary bolt Galvanized bolt M20
Ordinary bolt Galvanized bolt M12
Brace nut Galvanized bolt M12
Bracing System
Cross brace Φ20 round steel bar Q235, process and painted (alkyd painting)
Angle brace L50*5 angle steel Q235, process and painted (alkyd painting)
Column bracing Φ25 round steel bar Q235, process and painted (alkyd painting)
Tie bar Φ127*3 steel pipe Q235, process and painted (alkyd painting)
Batter brace Φ32*2.5, Φ12 round steel bar Q235, process and painted (alkyd painting)
Wall & Roof System
Roof panel Corrugated steel plate or sandwich panel (EPS/fiber glass/rock wool/PU)
Wall panel Corrugated steel plate or sandwich panel (EPS/fiber glass/rock wool/PU)
Edge cover 0.5mm color plate, angle Alu.
Fittings & accessories Nails, glue etc.
Unpowered ventilator Diameter Φ600, stainless steel
Sky lighting band 1.2mm FRP, double layer
Sliding door sandwich panel door
Roof drainage system
Gutter 0.5mm color steel plate
Rainspout pipes Φ110 PVC pipe

 

Height 12.5m Logistics Steel Structure Construction 0

 

 

Our Steel Structure Production Plant:

The floor space of our steel structre fabrication factory is 35,000㎡, and the workshop area is 20000㎡. We own three light/heavy H steel production lines, BOX production lines, C/Z purlin production lines and various types of profiling steel sheet machines with advanced equipment such as plasma cutting machine.

 

Height 12.5m Logistics Steel Structure Construction 1

 

 

Advantages of Prefab steel structure buildings:

 

No. High strength and light weight Although the density of steel is larger than that of other building materials, its strength is very high. Under the same force, the steel structure has a small weight and can be made into a structure with a large span.
2 Good plasticity and good toughness The plasticity of the steel is good, and the structure will not suddenly break due to accidental overload or partial overload. The toughness of the steel is good, making the structure more adaptable to dynamic loads.
3 High degree of industrialization in production The steel structure is mainly produced in a specialized metal structure factory, so the production is simple and the precision is high.
4 Simple construction and short construction period All components are prefabricated at the factory, and the site is simply assembled, which greatly shortens the construction period.
5 Wind resistance and structural stability Steel structure construction with light weight, high strength, good overall rigidity and strong deformation ability
6 Saving construction costs The steel structure has light weight, reduces the basic cost, and has a fast construction speed. It can be completed and put into operation as soon as possible, and the comprehensive economic benefits are much better than the concrete structure.
7 Recyclable Steel can be recycled, less environmentally polluted when constructed and removed
 
Why did you choose us?

 

Many customers have visited our factory for the long term cooperation."Quality firstly,Customer firstly" is our company principle.We obtain sound reputation because of our good quality and service. Meanwhile,We pay attention to the team work and value win-win cooperation, which would guide us much further.

  1. Low cost---Professional design, less construction time; saving raw materials.
  2. Environmental protection---specialized cladding materials guarantee excellent acoustic and insulation performance; no pollution ;Raw material can be recycled
  3. Comfortable and aesthetic---higher using areas and bigger building bays afford us wider viewpoints; distinctive and elegant profiles.

Contact Details
Qingdao Ruly Steel Engineering Co.,Ltd

Contact Person: steven

Tel: 0086-18661691560

Send your inquiry directly to us (0 / 3000)