Product Details:
|
Features: | Prefab Steel Structure, Large Span, Multi-Floor | Corrosion Resistance: | Yes |
---|---|---|---|
Cost: | Affordable | Customization: | Available |
Durability: | High | Fire Resistance: | Yes |
Installation: | Easy | Maintenance: | Low |
Material: | Steel | Size: | Customizable |
Strength: | Strong | Type: | Fabrication |
Usage: | Construction | Drawing: | CAD, Tekla, 3D Model, Pkpm, Bim |
Surface Treatment: | Painting Or Hot-DIP Galvanized | Transport Package: | Standard Export Package Or Customers Requirement |
Origin: | Qingdao China | Connection Form: | Bolt Connection |
Type Of Steel For Building Structure: | H-Section Steel | Residential Wall Structure: | Wall Support |
Columns & Beams: | H-Section Steel | Raw Steel Material: | Q235B, Q355b, ASTM A36 |
Parapet Wall: | As Requested | Certification: | CE, Aisc, SGS, BV, ISO, GB |
Residential Wall Structure Building: | Steel Cladding Sheet/Sandwich Panel | Wall And Roof: | Steel Cladding Sheet, Sandwich Panel |
Specification: | Prefab Steel Buildings | HS Code: | 9406900090 |
Highlight: | Steel Beam Column Prefabricated Metal Warehouse,Prefabricated Metal Warehouse,Portal Frame Steel Beam Column |
Fast Erection Competitive Quotation Steel Structure Prefabricated Metal Warehouse Workshop Building Prefab House
One of the main reasons for the quick installation of steel structures is the use of prefabricated components. These components are manufactured off-site and then transported to the construction site, where they are quickly assembled. This eliminates the need for time-consuming on-site fabrication, reducing the overall construction time.
Moreover, the design and planning process for steel structures are also faster compared to traditional construction methods. With advanced computer-aided design (CAD) software, precise and detailed plans can be created, allowing for quick and efficient construction.
Additionally, the lightweight nature of steel makes it easier and faster to handle and transport compared to other building materials. This also contributes to the speedy installation of steel structures.
Another factor that contributes to the rapid installation of steel structures is the use of specialized equipment and tools. This allows for more efficient and precise construction, reducing the overall construction time.
Furthermore, the customizable design of steel structures also plays a role in their quick installation. With the ability to add or remove sections, steel structures can be adapted to fit the specific needs and requirements of a project, allowing for a faster and more efficient construction process.
In conclusion, the rapid installation of steel structures is a major advantage, making it a preferred choice for construction in various industries. With its prefabricated components, advanced design and planning processes, and specialized equipment, steel structures can be erected in a shorter time, saving both time and costs.
Name | Pre Manufactured Steel Structure Workshop / Long Span Heavy Industrial Steel Buildings |
Structure Type | Portal frame, single ridges,multi spans |
Length | 350m |
Width | 80m |
Eave Height | 15m |
Roof Slope | 10% |
Gable Wall Column Spacing | 7.5m |
Roof | steel cladding sheet, sandwich panel |
Wall | steel cladding sheet, sandwich panel |
Door | Sliding door |
Window | Ribbon Skylight |
Height difference between indoor and outdoor | 300mm |
No. | Item | Details of steel structure building or steel frame | |
1 | Material | Material | carbon structural steel |
2 | Produce | Lead time | Normallly 45days after down payment, also according to quantity. |
3 | Quality | Certification | Quality certificate from factory, the third party by client request. |
4 | Dimensions | Length | H beam: 4000-15000mm |
5 | Thickness: | web plate: 6-32mm | |
6 | wing plate: 6-40mm | ||
7 | Height | 200-1200mm | |
8 | Color | According to customers | |
9 | Size | MOQ is 1000 m2, width * length * eave height, | |
10 | Main components | Base | Cement and steel foundation bolts |
11 | Main frame | H Steel beam, Q235 Q345 steel H beam and columns, painted or galvanized, box steel, galvanized C section or steel pipe | |
12 | Secondary frame : | galvanized C or Z purlin , steel bracing , tie bar , knee brace ,flashing etc. | |
13 | Material | Q235B, Q345B or others as buyers' requests, like: ASTM, BSEN, DIN, IPE,AISI,JIS, | |
14 | Purlin | C or Z purlin: Size from C120~C320, Z100~Z20 | |
15 | Column | X-type, tree type ,lattice, Cross, Box etc. | |
16 | Bolt | Plain bolt and High-strength bolt | |
17 | Roof & wall | PU sandwich panel, Rockwool sandwich panel or Corrugated steel sheet | |
18 | Canopy | steel sheet, PU sandwich panel, Rockwool sandwich panel | |
19 | Door | Sliding or rolling door | |
20 | Window | Aluminium alloy window | |
21 | Surface | Two lays of rust-proof painting or Hot Dip Galvanized | |
22 | Sheet | 0.5mm or 0.6mm galvanized sheet | |
23 | Accessories | Semi-transparent skylight belts, Ventilators,down pipe, Galvanized gutter, Trim, flashing, etc | |
24 | Finishing options | Vast array of colors and textures available, Alkyd painting, two primary painting, two finish painting (gray paint, red paint, white paint, epoxy zinc etc.). Or Galvanized. | |
25 | Usages | 1. Steel workshop, steel warehouse, steel structure plant | |
26 | 2. Steel web frame structure | ||
27 | 3. Steel H-column and steel H-beam | ||
28 | 4. Portal frame products | ||
29 | 5. High rise building project | ||
30 | 6. Others steel structure buildings |
The floor space of our steel structre fabrication factory is 35,000㎡, and the workshop area is 20000㎡. We own three light/heavy H steel production lines, BOX production lines, C/Z purlin production lines and various types of profiling steel sheet machines with advanced equipment such as plasma cutting machine.
All the structure components, panels,bolts and sort of accessories will bewell packed with standard package suitable ocean transportation and loaded into 40’HQ.
All the products are loaded at the loading site of our factory using crane and forklift by our skilled workers,who will prevent the goods to be damaged.
The following question we need to know before making the price. Just feel free to fill what you know.
1 | Location (where will be built?) | _____country, area |
2 | Size: length*width*height | _____mm*_____mm*_____mm |
3 | wind load (max. wind speed) | _____kn/m2, _____km/h, _____m/s |
4 | snow load (max. snow height) | _____kn/m2, _____mm |
5 | anti-earthquake | _____level |
6 | brickwall needed or not | If yes, 1.2m high or 1.5m high |
7 | thermal insulation | If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; . if not, the metal steel sheets will be ok. The cost of the latter will be much lower than that of the former |
8 | door quantity & size | _____units, _____(width)mm*_____(height)mm |
9 | window quanity & size | _____units, _____(width)mm*_____(height)mm |
10 | crane needed or not | If yes, _____units, max. lifting weight____tons; max. lifting height _____m |
Contact Person: steven
Tel: 0086-18661691560