steel warehouse

Steel Structure Warehouse
December 04, 2024
Category Connection: Steel Structure Construction
good quality
Brief: Discover our Large Span Pre Engineered Steel Buildings with Crane Support, designed for industrial applications like electric appliance workshops. These prefabricated structures offer turnkey solutions, including design, fabrication, and installation, with a service life of 50 years. Perfect for steel plant buildings and factory constructions.
Related Product Features:
  • Large span pre-engineered metal buildings with crane support for industrial applications.
  • Made from high-quality steel materials like Q235B, Q355B, and ASTM A36.
  • Surface treatment options include painting or hot-dip galvanizing for durability.
  • Wall and roof panels feature 75mm glass wool sandwich panels for insulation.
  • Designed for a service life of 50 years with structural reliability.
  • Includes H-section steel columns and beams for robust construction.
  • Customizable with options for thermal insulation, doors, windows, and cranes.
  • Complete turnkey solutions covering design, fabrication, and installation.
Faqs:
  • What materials are used in the construction of these steel buildings?
    The buildings are constructed using carbon structural steel such as Q235B, Q345B, or ASTM, BSEN, DIN standards, with options for painting or hot-dip galvanizing.
  • How long does it take to manufacture and deliver these steel structures?
    The production lead time is typically 45 days after the down payment, depending on the quantity and specifications required.
  • What are the customization options available for these steel buildings?
    Customization options include thermal insulation materials (EPS, fiberglass wool, rockwool, PU sandwich panels), door and window sizes, and crane specifications based on your requirements.
Related Videos

Steel warehouse

Steel Structure Warehouse
August 07, 2025

Steel warehouse

Steel Structure Warehouse
August 07, 2025

Steel warehouse

Steel Structure Warehouse
August 07, 2025

loading

Packing Loading
December 03, 2024

loading

Packing Loading
December 03, 2024